Educational estimate · PKR CONTEXT
Futures Liquidation Estimate Calculator
Isolated Futures Liquidation Estimate Calculator aik simplified taleemi qeemat dikhata hai; yeh Binance risk engine ya Cross Margin account ka exact nateeja nahin.
Futures Liquidation Estimate Calculator
Educational estimateCalculation result
Calculation result
Formula & assumptions
Result se pehle formula samjhein
Open formula
long = entryPrice * (1 - 1 / leverage + maintenanceMarginRate)
short = entryPrice * (1 + 1 / leverage - maintenanceMarginRate)
Assumptions
- Aik hi USDT-M position hai aur margin baad mein add ya remove nahin hota.
- Maintenance bracket, fees, Funding aur liquidation deduction simplified formula mein shamil nahin.
- Mark Price aur live account state user khud exchange par verify karta hai.
Worked example: Long entry 100 USDT, 10x aur maintenance rate 0.005 par estimate 90.5 USDT hai. PKR 10,000 equivalent margin ka zikr local context deta hai, formula ko PKR conversion se exact exchange result nahin milta.
SENSITIVITY LAB
Leverage estimate ko kaise badalta hai
| Leverage | Long estimate | Short estimate |
|---|---|---|
| 5x | 80.5 | 119.5 |
| 10x | 90.5 | 109.5 |
| 15x | 93.8333 | 106.1667 |
| 20x | 95.5 | 104.5 |
| 25x | 96.5 | 103.5 |
Fixed inputs: entry 100 aur maintenance margin rate 0.5%. Sirf isolated educational estimate.
Maqsad aur result ki samajh
Entry, side, leverage aur user ke live maintenance margin rate ko aik wazeh formula mein rakh kar dekhna ke estimate entry ke kitna qareeb aata hai.
- Long estimate entry se neeche aur Short estimate entry se upar hona chahiye.
- Yeh sirf Isolated linear position ka arithmetic andaza hai; Cross Margin ka exact number nahin.
Ghalat input
Leverage 1 se kam, entry non-positive, ya maintenance rate 0 se kam ya 1 ke barabar/zyada ho to calculation rok di jati hai.
Binance ke live result se farq
Binance Mark Price, notional bracket, maintenance deduction, wallet balance, fees, Funding aur margin mode use karta hai. Cross Margin poore account par depend karta hai.
Failure conditions
- Position bracket badlay ya Mark Price trade price se door ho to estimate drift karta hai.
- Cross, Multi-Assets ya Portfolio Margin mein single-position formula account state ko capture nahin karta.
Risk note
Fast market mein actual liquidation handling aur fill estimate se badal sakte hain. Is faslay ko maximum acceptable loss na samjhein.
Content checked: